|
Wind Farms:
Our wind farms have been executed following the assembly procedures that INNEO has developed to achieve an assembly performance of 2 towers per week.
|
Location
|
Wind Farm
|
Generator
|
Tower
|
Number of Towers
|
Year
|
Condition
|
|
Tafalla (Navarra)
|
AIBAR
|
AWP 1.5 Mw
|
INNEO 80m/1.5Mw
|
1
|
2006 |
In Service |
|
Cerro blanco (Albacete)
|
CERROBLANCO
|
AWP 1.5 Mw
|
INNEO 80m/1.5Mw
|
7
|
2007 |
In Service |
|
Ayora
|
LOSILLA
|
AWP 1.5 Mw
|
INNEO 80m/1.5Mw
|
16
|
2008 |
In Service |
|
Enguera (Valencia)
|
BOIRA
|
AWP 1.5 Mw
|
INNEO 80m/1.5Mw
|
23
|
2008 |
In Service |
|
Tafalla (Navarra)
|
PEÑABLANCA
|
AWP 3.0 Mw
|
INNEO 100m/3Mw
|
1
|
2008 |
In Service |
|
Enguera (Valencia)
|
BENALAZ - I
|
AWP 1.5 Mw
|
INNEO 80m/1.5Mw
|
23
|
2º Trimestre 2009
|
In Stock
|
|
Enguera (Valencia)
|
BENALAZ - II
|
AWP 1.5 Mw
|
INNEO 80m/1.5Mw
|
11
|
2º Trimestre 2009
|
In Stock
|
|
|
Yet to be determined
|
AWP 3.0 Mw
|
INNEO 100m/3Mw
|
3
|
3er Trimestre 2009
|
In Stock
|
|
Unzué (Navarra)
|
ALAIZ
|
AWP 1.5 Mw
|
INNEO 100m/1.5Mw
|
3
|
3er Trimestre 2009
|
In Stock
|
P.E. AIBAR
P.E. CERROBLANCO
P.E. LOSILLA
P.E. BOIRA
P.E. PEÑABLANCA
|